I NEED A SLOPE CLEARED AND LEVELED FOR A 7.2 X 9M GARAGE. I HAVE THE FOUNDATION FOOTING AND SLAB DETAIL REQUIRED. IF YOU CAN ORGANISE BOXING AND CONCRETE THAT WOULD BE GREAT OTHERWISE EARTHWORKS ONLY IS FINE. I WOULD LIKE THE WORK TO BE COMPLETED BEFORE THE END OF YEAR AS THE LAST GUY HAS NOT GOT BACK TO ME SO I AM TRYING AGAIN.
#1 | Tradie 1 |
|
20 jobs | No longer in contact |
Partner with Builderscrack
Get work