Excavation and soil removal required to level off the western side of our property. See red-boxed area on site plan. Approx 80m2 with elevation gradual from ground level up to 400mm.
#1 | Tradie 1 |
|
14 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 2 jobs | No longer in contact |
#3 | Tradie 3 |
|
27 jobs | No longer in contact |
#4 | Tradie 4 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work