URGENT: Need a DIGGER OPERATOR to do earthworks, and post hold boring. We have a builder booked in mid June to do a retaining wall and our previous digger choice has fallen through unexpectedly. We have access available via next door neighbours while they are building a house. The access is from the road, down a shingle path, and then around the side of our house to the backyard where the work needs to be done. We have a small budget based on what was agreed to before the work fell through. We will need this job done by the end of May at the latest. You will need your own digger (we aren't paying hireage costs + labour as that's too much of a rip) and ideally it'll be a 1.5tonne. A 2.5tonne could get through, but with the wet weather coming through, not clear whether the ground will support it - it's clay all around. Oh, and if you know someone that is looking for a free site to dump their backfill, we need about 10m3.
#1 | Tradie 1 | Not reviewed | 1 job | No longer in contact |
#2 | Tradie 2 |
|
2 jobs | No longer in contact |
#3 | Tradie 3 |
|
279 jobs | No longer in contact |
#4 | Tradie 4 |
|
33 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work