We would like about 4 cubic meters of soil and clay excavated from below our house and the spoil deposited on the driveway. Access is via a double garage and height of door is only 2m. The cellar can be accessed via an existing opening 1120 wide by 1860 high, please see attached photos. The job will be ready to start the excavation by Monday 16 May. A pdf containing plan and cross section will be emailed to interested parties on request.
#1 | Tradie 1 |
|
2 jobs | No longer in contact |
#2 | Tradie 2 |
|
14 jobs | No longer in contact |
#3 | Tradie 3 |
|
80 jobs | No longer in contact |
#4 | Tradie 4 |
|
14 jobs | No longer in contact |
#5 | Tradie 5 |
|
28 jobs | No longer in contact |
#6 | Tradie 6 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work