We need a 600mm deep trench dug for undergrounding a power cable. The trench needs to be approximately 15m long as close to the side boundary as possible, excavating from the front boundary up to the house. The trench needs to be dug before the 10 February. Access is available off the road for a small digger.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Quick and responsive. Good job.
Work carried out by the owner/operator
Reviewed on 22-02-2022