Review

Trench Excavation

Job description

Conduit Installation
North Shore

We need a 600mm deep trench dug for undergrounding a power cable. The trench needs to be approximately 15m long as close to the side boundary as possible, excavating from the front boundary up to the house. The trench needs to be dug before the 10 February. Access is available off the road for a small digger.