We require an area of our section flattened in preparation for ready lawn. The area is sloping and reasonably flat but needs proper leveling. Area approximately 4m by 12m bordering the driveway. Scraped-off earth to be left at section to be used as fill at rear of property.
#1 | Tradie 1 |
|
14 jobs | No longer in contact |
#2 | Tradie 2 |
|
6 jobs | No longer in contact |
Partner with Builderscrack
Get work