Urgent - labour required to dig up berm and replace with topsoil. Start immediately. There's a berm in front of our fence that needs to be dug out. Details below: - It's 12m long and 2.1m wide - It needs the grass on top removed and thrown into a general waste skip (which I will supply) - The berm then needs to be dug out to be about 50mm lower than the berm, and this soil placed into a hardfill bin (which I will supply) - It will then need to be filled with topsoil to level of berm (which I will supply)
#1 | Tradie 1 |
|
250 jobs | No longer in contact |
#2 | Tradie 2 |
|
14 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 4 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 1 job | No longer in contact |
#5 | Tradie 5 |
|
14 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 172 jobs | No longer in contact |
Partner with Builderscrack
Get work