10M x 5M area needs to be excavated roughly 100 to 300mm to allow for a deck to be built. This will require a small machine as it need to cross a new concrete pad. Approx 50M of an open waterway(currently still dry) needs to be opened up and removed soil to be used to back fill a newly layed nova flow. Estimate about 3 days work for a digger and dump truck. More work available and some bigger jobs to be priced if available.