Existing concrete driveway removed. Excavate down to planned depth. Base course, bindings ect compacted. Once i have installed shuttering and pre pour work - steel and rib raft design: contractor to pour concrete slab. Plans are available
#1 | Tradie 1 |
|
22 jobs | No longer in contact |
#2 | Tradie 2 |
|
1 job | No longer in contact |
#3 | Tradie 3 |
|
26 jobs | No longer in contact |
#4 | Tradie 4 |
|
279 jobs | No longer in contact |
#5 | Tradie 5 |
|
28 jobs | No longer in contact |
Partner with Builderscrack
Get work