After mini excavator and operator to dig out marked trenches. Just need drains dug, spoil can be left on site. Required depth for trenches is 400mm sloping down to approx 600mm. Approx 35m of trenching in total. Access is via sealed driveway and across level grass area. Hoping to get this completed in the next few weeks.
Partner with Builderscrack
Get work