Review

Communication trench, post holes and pad clearance

Job description

Earth-Moving
Hutt Valley

I require approximately 57m of trench dug for main power line approximately 800mm deep. Also two post holes and a flat area made for --- litre water tanks


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Carl accepted the job the night before due to another company cancelling at last minute. Dropped what he was doing and turned up the next day to complete the job

Work carried out by the owner/operator
Reviewed on 26-02-2019

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo