I require approximately 57m of trench dug for main power line approximately 800mm deep. Also two post holes and a flat area made for --- litre water tanks
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Carl accepted the job the night before due to another company cancelling at last minute. Dropped what he was doing and turned up the next day to complete the job
Work carried out by the owner/operator
Reviewed on 26-02-2019
Partner with Builderscrack
Get work