Published: 1 September 2024
I need two post holes dug, 1m deep in an existing deck. The decking boards have been removed around the area, more can be removed if required. And two posts fitted into the holes to support decking.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Dan was friendly, hardworking and completed the job requested on time and on budget. Would recommend using Dan!!
Work carried out by the owner/operator
Reviewed on 15-09-2024
#1 | Tradie 1 |
|
19 jobs | Secured job |
#2 | Tradie 2 |
|
7 jobs | No longer in contact |
#3 | Tradie 3 |
|
23 jobs | No longer in contact |
#4 | Tradie 4 |
|
3 jobs | No longer in contact |
#5 | Tradie 5 |
|
8 jobs | No longer in contact |
#6 | Tradie 6 |
|
6 jobs | No longer in contact |
Partner with Builderscrack
Get work