There are 21 holes to be dug 400 mm diameter and 1 m deep. These will need to be dug by a two man post hole borer as a digger cannot access this area. The holes are to run 1.2m out from the existing deck line. Spoil does not need removal. The preferable date for these is the 19th and 20th of April. The site is 30 minuets north of Waiuku.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great Team. Just got the job done.
Work carried out by the owner/operator
Reviewed on 20-04-2021