Looking for a digger and driver for small earthworks and post hole digging for 2 x small retaining walls. See photo. Blue is small earthworks, and red is hole digging for posts. Earth can be moved above red holes so no need to take this away. The holes will need to be at least 1 meter deep and these will be marked out prior to digging. Additionally 4 more holes required on left berm not pictured here. (note must be able to supply own digger for job). Start time for job is flexible between mid May to mid June.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Phil was very good and happy with services. Got in touch early. Would recommend
Work carried out by the owner/operator
Reviewed on 03-08-2020
Partner with Builderscrack
Get work