Published on 10 January 2025
The existing holy plant and ivy need to be cleared from beside the walkway. We should consider using a small digger to assist with the clearing. There is approximately a one-meter drop from the garage to the side area that we're trying to clear. Additionally, we need to install timber posts in preparation for a timber retaining wall that will be up to 1.4 meters high.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great job has been done.
Work carried out by the owner/operator
Reviewed on 17 February 2025
Partner with Builderscrack
Get work