Published: 28 August 2023
Stage 1: - level site in and around foundation and sand dunes, including removal of spoil Stage 2: - dig and compact driveway to less 50mm of engineered spec in and around the drainage contractor.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 03-10-2023
Partner with Builderscrack
Get work