I need to dig a garage on the side of my 1920s house, the house will be propped before the start of the earth moving job. There will be : digging 288 m3, which includes removal 213m3, topsoil reused locally directly after digging it: 25m3, soil stored locally for drain refill 50m3 easy access for trucks
#1 | Tradie 1 |
|
8 jobs | No longer in contact |
#2 | Tradie 2 |
|
23 jobs | No longer in contact |
#3 | Tradie 3 |
|
16 jobs | No longer in contact |
#4 | Tradie 4 |
|
14 jobs | No longer in contact |
Partner with Builderscrack
Get work