Cut and remove hot mix 500mm, excavate site for new flora/ foundation 6m x 4.2m to a depth of 300mm and remove spoil from site.
#1 | Tradie 1 |
|
8 jobs | No longer in contact |
#2 | Tradie 2 |
|
40 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 4 jobs | No longer in contact |
#4 | Tradie 4 |
|
16 jobs | No longer in contact |
#5 | Tradie 5 |
|
66 jobs | No longer in contact |
Partner with Builderscrack
Get work