Excavation to a depth of 150mm for a flat site of 450 sq.m . The soil is contaminated with Asbestos fragments. The excavated soil has to be dumped in Kate Valley.
#1 | Tradie 1 |
|
90 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 6 jobs | No longer in contact |
#3 | Tradie 3 |
|
8 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 2 jobs | No longer in contact |
Partner with Builderscrack
Get work