Published: 25 June 2024
Trenching to lay underground conduit for power and fibre (including backfill once ducts are laid by my electrician). This may require removal or grinding of two or three tree stumps (see photos). Removal of a concrete slab (old shed slab - looks relatively thin and I expect not well reinforced (if at all) so hopefully will pull up easily. Auger 900mm deep by 400mm holes for timber pile foundations to house extension and new deck. There is risk that there could be a few boulders (being Mt Albert) so having a breaker available could be handy. I've attached a sketch and some photos to provide a better indication of requirements. Potential that a couple of drainage trenches could be added to scope too.