Require ground levelling in preparation for the installation of a new garden shed. Previous shed was constructed on sloping ground. Now require the high side of the ground (as illustrated from floor of old shed) to be excavated so it matches the level of the low side. There is a gap of approx 1.9 metres between a support post for an upstairs deck and the bank behind, so a bobcat or similar earthmoving vehicle should be able to get into the space easily. Would also need the earth/rock removed from site at the completion of the work.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Terrific work. Phil arrived as promised and completed a really professional job in record quick time. Would not hesitate to use him again for any similar work. Highly recommended service!!!
Work carried out by the owner/operator
Reviewed on 06-05-2021
Partner with Builderscrack
Get work