We require 16 Post Holes dug for piles for an outdoor sleepout/office in the back garden. The holes need to be dug to 900mm deep and 450mm wide. Holes will be marked out ahead of job. There is a possibility of some small areas of volcanic rock. Job needs to be completed by end of day 27th Jan. Happy for site visit if required.
#1 | Tradie 1 |
|
14 jobs | No longer in contact |
#2 | Tradie 2 |
|
27 jobs | No longer in contact |
#3 | Tradie 3 |
|
6 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 5 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 1 job | No longer in contact |
#6 | Tradie 6 |
|
29 jobs | No longer in contact |
Partner with Builderscrack
Get work