The trench down the side wall of the house needs to filled in with earth. The earth is already on the property to the side. Expected timeframe 2-3 days There is no digger access so would need to be done by hand.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Did a great job. Friendly and reliable. Thanks!