Dig a trench approximately 25 mts long to take a power cable to he shed 20 mts in soft lawn and 5 mts through a garden , depth 300 mil Need to save the top grass to replace once filled
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Well done
Work carried out by a subcontractor
Reviewed on 12-08-2020
#1 | Tradie 1 | No recent reviews | 1 job | Secured job |
#2 | Tradie 2 |
|
14 jobs | No longer in contact |
#3 | Tradie 3 |
|
26 jobs | No longer in contact |
#4 | Tradie 4 |
|
19 jobs | No longer in contact |
#5 | Tradie 5 |
|
11 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 76 jobs | No longer in contact |
Partner with Builderscrack
Get work