Need a couple of 640mm trenches dug for 32mm conduit installation. 1) House to slab (half already dug to approx 500mm) 2) Slab to fence If the trench to the house can be dug without cutting the pathway (i.e. tunnel under) that would be ideal. But more concerned with the cost of this job rather than replacing a small section of the path. Painted sections of the concrete slab (100mm) will also need to be cut out so conduit can be brought up. Removed fill to be left onsite for backfilling the trench.
#1 | Tradie 1 | No recent reviews | 1 job | No longer in contact |
#2 | Tradie 2 | No recent reviews | 76 jobs | No longer in contact |
#3 | Tradie 3 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work