We had a trench dug a few years ago for fibreoptic internet, and the waste was all left piled along the driveway. It's now growing ivy and all sorts - and I'd like it level! There's tree branches/logs etc as well as rocks and fill, would require a small digger and tuck to take away all the rubble. Driveway is a long one, about 80m but has good access. There is a water main pipe running along the top as well that needs to be considered, it can move out of the way and ideally buried after it's level! I would like the toitoi plant dug out as well.
#1 | Tradie 1 | No recent reviews | 8 jobs | No longer in contact |
#2 | Tradie 2 |
|
19 jobs | No longer in contact |
#3 | Tradie 3 |
|
6 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 11 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 7 jobs | No longer in contact |
#6 | Tradie 6 | Not reviewed | 0 jobs | No longer in contact |
#7 | Tradie 7 |
|
7 jobs | No longer in contact |
#8 | Tradie 8 |
|
138 jobs | No longer in contact |
Partner with Builderscrack
Get work