This job is to cut about 50m2 ground at a depth of about 0.5m, and a rectangular block in ground of 15sqm x 2.4m, and breaking three concrete piles. All spoil and waste materials will need to be carted away from the site and dumped to a designated dump location. Total volume is about 60m3. I am looking at a fixed price contract.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Super professional and highly experienced team. Was like a breeze of fresh air.
Work carried out by an employee of the company
Reviewed on 13-08-2018
Tradesperson reply
"Thank you for your feedback, we really appreciate it."
Partner with Builderscrack
Get work