Published on 20th March 2025
Removing soil and leveling of front lawn as far back to house as possible, removing of old concrete fencing and gate. Removing of grapefruit tree. We are still wanting to use the driveway during work if possible. It is ok to have an degree angle sloping to driveway when removing soil as long its flat and give room to build a double garage later. Water and sew lines are long left side (looking from house to road) of fence line marked by a clay pipe sticking out.
| Quality of work | — | The quality of workmanship provided |
| Cost | — | How well they kept to the quoted cost |
| Schedule | — | How well they kept to schedule |
| Communications |
5.0
|
Their professionalism and responsiveness |
"Ra is a top man, highly recommend and excellent communication, fast and quick too."
Review posted by Terry on 24th March 2025
"Thank you for the kind words Terry I really appreciate it"
24th March 2025
Verified communication review
Partner with Builderscrack
Get work