Hi. We are after a quote for a renovation/new extension on our property. Current bungalow is rewired and we will have all internal linings off for the work required. Bungalow already has Ppoints and lights, but there will be some moving of these as well as new light fittings installed, as per plans. The new build element will be the same, walls off, but will require new cabling. Possibly two stages of wiring, as bungalow will be ready for action earlier I would think. It would be good if the bungalow and new build element could be quoted separately. Happy to provide more info around where the old and new build elements start and finish, so as to allow for the various quotes to be split correctly. Also I have a plan for powerpoint locations etc. Hardware will also be required. Build timeline is approx May- Oct 2020 Thanks
#1 | Tradie 1 |
|
21 jobs | No longer in contact |
#2 | Tradie 2 |
|
69 jobs | No longer in contact |
#3 | Tradie 3 |
|
150 jobs | No longer in contact |
#4 | Tradie 4 |
|
28 jobs | No longer in contact |
#5 | Tradie 5 |
|
47 jobs | No longer in contact |
#6 | Tradie 6 |
|
109 jobs | No longer in contact |
#7 | Tradie 7 |
|
96 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 3 jobs | No longer in contact |
Partner with Builderscrack
Get work