Wanted to replace the old 70s style electrical switchboard with modern flush switchboard. - Remove old switchboard & the GIB sheet encasing it - Install new GIB sheet (can be supplied) and 15- or 30-way flush switchboard - If required to comply increase capacity of h/w controlled and continous circuits to 15A/63A. Distance from the meter to the switchbaord is approx. 10m - Two airconditioning units currently share the same 2.5mm cable - install a dedicated 2.5mm cable for the second unit. Distance from the meter to the switchboard is approx. 10m - Install dedicated 2.5mm cable for downstairs bathroom electrical equipment (toilet pump & ventilation). Distance from the meter to the switchboard is approx. 8m. - Other minor rewiring as needed to ensure compliance - Certificate of compliance for the work done Switchboard configuration approx, exact configration to be discussed: 1X63A main switch 1xSurge protector 4x20A MCB - each protected by individual RCD (power points) 1X10A RCB - supplied (bathroom) 3X10A MCB - each protected by individual RCD (lights) 1X32A MCB - (range) 1X15A MCB - (aircon unit 1) 1X20A MCB - (aircon unit 2) 1X15A MCB - (h/w controlled circuit) 1X15A MCB - (h/w boost circuit) Access is reasonable.
Workmanship |
5.0
|
All work's done as requested to a high standard without any stress or dramas.
Reviewed on 30-07-2009
#1 | Tradie 1 | No recent reviews | 75 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 19 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 0 jobs | No longer in contact |
#4 | Tradie 4 |
|
88 jobs | No longer in contact |
Partner with Builderscrack
Get work