Published: 29 November 2024
Renovating kitchen in January, need some sockets and light switchs added/removed. Would be ideal if you could do this on 6th January, or possibly during the last week before xmas (16th - 20th) Gib on walls and ceiling will be removed, they are being replaced after electrical work is completed.
#1 | Tradie 1 |
|
16 jobs | No longer in contact |
#2 | Tradie 2 |
|
17 jobs | No longer in contact |
#3 | Tradie 3 |
|
16 jobs | No longer in contact |
#4 | Tradie 4 |
|
51 jobs | No longer in contact |
Partner with Builderscrack
Get work