1. Adding two power points- this may needs to do some new wiring from the main power box to kitchen(for kettle & Toaster) & bathroom(for towel rail). Pictures are added 2. Upgrading Main power box with RCD- The main power box uses old circuit brokers as in the picture. So, upgrade them (if necessary ) & install a RCD for all ports in the house there is a new RCD circuit(which controls only 3 power ports) already there that doesn't need any change please see the photos attached. this is a wooden house with around one meter basement.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great person to work with. Excellent work quality.
Work carried out by the owner/operator
Reviewed on 25-04-2021
Partner with Builderscrack
Get work