Review

Wiring new build 80m2 shed/sleepout

Job image

Job description

General Electrical
Waipa

We have just finished construction on our 80m2 garage with laundry, toilet and 40m2 rumpus room and are in need of a quote to do the electrical work please. I have included a plan of the shed with our electrical plan drawn on it. To summarise, We need 6 double plugs, garage door wired in, 6 outdoor lights (we will provide these) to be fitted, led lighting in the garage and recessed downlights in the rumpus room. Also wanting an outdoor plug installed. There is a cable located close to the shed, but it may be insufficient for the power required for the shed. Distance between conduit already in place in shed and the meter in our house is no more than 15 metres. Shed will be available for work to be done in the next 3 weeks That's


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Really easy to work with and job done to a high standard. Was also the cheapest of all the quotes we recieved!

Work carried out by the owner/operator
Reviewed on 03-12-2020

Verified Builderscrack review

Trade professionals

#1 Tradie 1
39 jobs Secured job
#2 Tradie 2
72 jobs No longer in contact
#3 Tradie 3 Not reviewed 0 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo