Published on 16 March 2025
1. Run a 30amp cable from the board in the garage to the rear of the house in readiness for hit tub and a heat pump (part of the hot tub) 2. Run a 15amp cable from the board in the garage to the deck space to allow heating and light to be connected (not yet determined) for when a louvre is installed, louvre is only mech and not Elec controlled It will probably need a site visit to understand cable runs etc. Would like the work completed by 18th April-25
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Alan provided great service, and a very good communicator. As we continue to upgrade i will ask Alan to return to carry out the work Highly recommended
Work carried out by the owner/operator
Reviewed on 13 April 2025