Switch Board Change Over

Job image

Job description

Electrical Renovations
Waikato

We have been renovating out house and slowly switching over from old wire fuses to RCCB and CB in the electrical panel. Now at a stage where we can switch over the last fuses and remove all the remaining old hardware. Also looking to replace 1 circuit of old rubber tps with new tps and add a new socket outlet in. We will supply the majority of the hardware. RCCB, CB, enclosures, cabling, sockets etc. Really only after label to assist/supervise in the removal of the old fuses and installing the new RCCB etc and a COC at the end of it. I will provide the bulk of the labour where possible . Ive added a picture sort of showing what Im after. One MCB will be moved up to the enclosure on the left (Hotwater) Move one of the light circuits to an existing RCCB on the top right Then move two existing fused socket circuits to a new RCCB with the second light circuit. The remaining hardware is then reductant and can be removed


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo