New 7 new powerpoints installed, a heated towel rail installed, power taken outside to a spa pool and power taken to an outside building. Also a number of light switches changed to updated hardware.
#1 | Tradie 1 |
|
72 jobs | No longer in contact |
#2 | Tradie 2 |
|
56 jobs | No longer in contact |
#3 | Tradie 3 | Not reviewed | 1 job | No longer in contact |
#4 | Tradie 4 | No recent reviews | 30 jobs | No longer in contact |
#5 | Tradie 5 |
|
81 jobs | No longer in contact |
#6 | Tradie 6 |
|
31 jobs | No longer in contact |
Partner with Builderscrack
Get work