We are restoring a small 1950's caravan. It has a fuse wire switchboard which we need updating to a compliant RCD switchboard. We also need the electrical wiring certified (wall/ceiling lining is off) with an electrical warrant of fitness for the caravan. Would like this done soon so we can continue the reno.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Arrived on the job when he said he would. Advised us of a delay in parts arriving. Work done by the book. Were impressed he didn't charge us for travel.
Work carried out by the owner/operator
Reviewed on 14-07-2020
#1 | Tradie 1 |
|
37 jobs | Secured job |
Partner with Builderscrack
Get work