We need the switchboard in our house isolating so that a contractor can remove the asbestos backing. Then a temporary fix and turn back on of the power. This work is required to be done from 16th Dec and back on approx. 20th Dec. (In the new year we will also want a new switchboard and re-wire once we’ve removed wall linings).
#1 | Tradie 1 |
|
90 jobs | No longer in contact |
#2 | Tradie 2 |
|
215 jobs | No longer in contact |
#3 | Tradie 3 |
|
67 jobs | No longer in contact |
#4 | Tradie 4 |
|
109 jobs | No longer in contact |
Partner with Builderscrack
Get work