Replace existing fuseboard with modern distribution board. Replace some remaining black rubber sheathed wiring with modern cable. Replace supply cable from distribution board to master bedroom light switch. Add double switching to lights in hallway.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Ben was a pleasure to deal with. Good communication, punctual, friendly with children. Explained the reasoning behind any decisions that were made as the job progressed. Kept the place tidy whilst working and cleaned up any dust, etc after finishing for the day. Cost was very reasonable. I will definitely be contacting Ben, at least to provide a quote, when we have any further electrical work requirements in the future.
Work carried out by the owner/operator
Reviewed on 25-08-2020
#1 | Tradie 1 | No recent reviews | 43 jobs | Secured job |
#2 | Tradie 2 |
|
1096 jobs | No longer in contact |
#3 | Tradie 3 |
|
60 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 25 jobs | No longer in contact |
#5 | Tradie 5 |
|
32 jobs | No longer in contact |
#6 | Tradie 6 |
|
199 jobs | No longer in contact |
#7 | Tradie 7 |
|
82 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 64 jobs | No longer in contact |
Partner with Builderscrack
Get work