Looking for an electrician to fit off a 10m2 sleepout. All wires have been run and to correct locations, we just need fitted 2 x outdoor lights 2 x ceiling lights 2 x twin plugs 1 x single plug 1 x heater plug Lights switches. We have all the gear on site ready for the above we just need you to supply a fuse box and a caravan point for power supply. Job needs to be done ASAP so if you can’t fit it in in the next two weeks don’t chase. Thanks
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very easy to communicate with, job done on time and to a High standard. Thanks :)
Work carried out by the owner/operator
Reviewed on 14-09-2019
#1 | Tradie 1 | No recent reviews | 7 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 11 jobs | No longer in contact |
#3 | Tradie 3 |
|
199 jobs | No longer in contact |
#4 | Tradie 4 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work