Underground Power to 2 different sites from the existing connection point via easements as shown on attached plans with approximate measurements taken from GIS. The sites are: Lot 1 - Labeled 1.42ha on the plan - Power to be supplied via easement G Lot 2 - Labeled DP --- - Power to be supplied via either: Easement F. Shown on plan with distances as in Green Running along easement G with lot 1 above. Then along easement H to easement I. Shown in blue. Two quotes to compare costs: Quote 1: Running two seperate connections for each site: Power to Lot 1 - supplied via easement G. Power to Lot 2 - supplied via easement F. Quote 2: Running two connections via easement G. Pole and split to get one connection to lot 2 via easement I Power to Lot 1 - supplied via easement G. Power to Lot 2 - Also running via easement G. Then along easement H to easement I. Distances are shown in the plans attached in photos
#1 | Tradie 1 |
|
187 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 52 jobs | No longer in contact |
#3 | Tradie 3 |
|
196 jobs | No longer in contact |
#4 | Tradie 4 | Not reviewed | 0 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 0 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 6 jobs | No longer in contact |
Partner with Builderscrack
Get work