1. To combine 2 light switches and move dimmer switch to new location 2. To provide and install a new pantry cupboard light and switch 3. To move and install 4 new 10 amp power sockets 4. To upgrade an existing 15 amp power socket 5. To provide under bench sockets for a waste disposal unit and a dishwasher Existing cupboards have been removed and Gib has been stripped off walls. Targeting electrical rewiring in next 2 to 3 weeks ie before 28 May 2019.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 26-06-2019
Partner with Builderscrack
Get work