Installation of 4 powerpoints 3 light fittings (standard) 2 lightswitch points Wiring for powerpoints already run and looped (just needs termination) Flushboxes for powerpoints already mounted Walls are plywood clad timber frame with pinkbats (no conduit required) Most parts supplied, just need to supply your own 1mm 3 core for lights and 1mm two way strap for switch points. May need switch points supplied also. Cuts will need to be made for switches and lights. Ceiling very easily accessible Will also be looking to get installer to quote for doing the wiring for the rest of the garage (new build)
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Lincoln did a great job, communicated well, and understood exactly what needed to be done. He also freely offered up his ideas and expertise in order to improve our power distribution across our three phases. Would highly recommend him as an honest, highly skilled, and friendly electrician.
Work carried out by the owner/operator
Reviewed on 02-01-2021
Partner with Builderscrack
Get work