We are removing the wall between our lounge and dining room and need to have the light switches and powerpoint relocated. We also need to have a powerpoint installed for the new gas fireplace installation. Work must be done September 10th or at the latest the 11th.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Tom was fantastic to work with. He explained everything thoroughly and was creative in his ideas to make things work how we needed them to. Great communication, very clean and tidy and helpful. Thanks so much.
Work carried out by the owner/operator
Reviewed on 10-09-2019
Tradesperson reply
"Thanks for your review Christy. It was a pleasure to work with you, very easy communication. Let me know if you need anything in future!"
#1 | Tradie 1 | No recent reviews | 6 jobs | Secured job |
#2 | Tradie 2 |
|
72 jobs | No longer in contact |
#3 | Tradie 3 |
|
89 jobs | No longer in contact |
#4 | Tradie 4 |
|
187 jobs | No longer in contact |
Partner with Builderscrack
Get work