Updating the bathroom: 1) single heated downlight fitted in place of the current single hanging light 2) over-mirror spotlights fitted in place of existing over-mirror light 3) an old electric wall heater removed 4) 1x double hotpoint installed to replace old hotpoint not working. Would like it done pre-xmas if possible.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
The two young guys were very diligent and respectful. It was a pleasure to have them to do this work in our home.
Work carried out by an employee of the company
Reviewed on 04-12-2021
Partner with Builderscrack
Get work