We are installing a Spa pool and require an electrical connection to be run to the back of the concrete pad for it. 25amp wiring is required. We are still at boxing stage for concrete pad, so keen to see someone for advice on how wiring is best run before we pour.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Reviewed on 21-07-2022
Tradesperson reply
"Thanks Kelvin"
#1 | Tradie 1 |
|
37 jobs | Secured job |
#2 | Tradie 2 |
|
1 job | No longer in contact |
#3 | Tradie 3 |
|
26 jobs | No longer in contact |
Partner with Builderscrack
Get work