Published on 2nd June 2025
Tradesperson who installed new Heat pump and Rangehood in my rental property suggested to fix the following:
1. Change existing cable from stove to switchboard, replace faulty stove switch, install 32amps circuit breaker to meet the requirement for Stove.
2. Looks like there is no earth peg present in the building , so install 1 earth peg and cabling to switchboard (if it is true).
3. Replace main entry box and 1 rusty shackle.
4. Switchboard cover needs to be fix as it is touching/stopping new circuit breaker.
| Quality of work | — | The quality of workmanship provided |
| Cost | — | How well they kept to the quoted cost |
| Schedule | — | How well they kept to schedule |
| Communications |
5.0
|
Their professionalism and responsiveness |
"Good prompt communication and site visit. Honest professional advise. Highly recommend."
Review posted by Tatyana on 9th June 2025
"Thank you so much for your review. Very much appreciated"
9th June 2025
Verified communication review
Partner with Builderscrack
Get work