We need the power to an old sleepout disconnected before we get it demolished. We want the cabling to remain so we can put up a new building in the future.
#1 | Tradie 1 |
|
69 jobs | No longer in contact |
#2 | Tradie 2 |
|
4 jobs | No longer in contact |
#3 | Tradie 3 |
|
120 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 69 jobs | No longer in contact |
Partner with Builderscrack
Get work