Connect 3 phase to meter box 20 M . Connect 2 phase power to house 36 M. Wire UV filter, water and wastewater pumps 34m. Move switch board from back to the front of cupboard. Trench work can be done by owner. Hoping to be done by last week of may /early June.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Awesome job done . Highly recommend Harmony for your electrical work.
Work carried out by the owner/operator
Reviewed on 15-06-2022
#1 | Tradie 1 |
|
18 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 5 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 3 jobs | No longer in contact |
Partner with Builderscrack
Get work