My house 1970, distribution board is a mess due to 2 add-on during the past years, I need it to be upgraded to Single pole 100 amp main switch 1 x 10 amp RCBO (lighting), 5 x 16 amp RCBO (power point circuits), 1 x 32 amp MCB (stove) 1 x ? amp heat pump +/-2 spare ways for future upgrade. ( this is just an estimated requirements) I recon this is a 2-3 hour job. All the wires are there You are to supply the db board, and certification I have no objection to a 2nd hand board
#1 | Tradie 1 | No recent reviews | 5 jobs | No longer in contact |
#2 | Tradie 2 |
|
31 jobs | No longer in contact |
#3 | Tradie 3 |
|
25 jobs | No longer in contact |
#4 | Tradie 4 |
|
2 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 14 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 7 jobs | No longer in contact |
#7 | Tradie 7 |
|
47 jobs | No longer in contact |
#8 | Tradie 8 |
|
22 jobs | No longer in contact |
Partner with Builderscrack
Get work