Active job

renew 1970 distribution board

Job image
Job image

Job description

Electrical Renovations
Hamilton

My house 1970, distribution board is a mess due to 2 add-on during the past years, I need it to be upgraded to Single pole 100 amp main switch 1 x 10 amp RCBO (lighting), 5 x 16 amp RCBO (power point circuits), 1 x 32 amp MCB (stove) 1 x ? amp heat pump +/-2 spare ways for future upgrade. ( this is just an estimated requirements) I recon this is a 2-3 hour job. All the wires are there You are to supply the db board, and certification I have no objection to a 2nd hand board


Trade professionals

#1 Tradie 1 No recent reviews 5 jobs No longer in contact
#2 Tradie 2
31 jobs No longer in contact
#3 Tradie 3
25 jobs No longer in contact
#4 Tradie 4
2 jobs No longer in contact
#5 Tradie 5 No recent reviews 14 jobs No longer in contact
#6 Tradie 6 No recent reviews 7 jobs No longer in contact
#7 Tradie 7
47 jobs No longer in contact
#8 Tradie 8
22 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo